Tianshan Shengli Tunnel Comprehensive Emergency Drill
Stable Live Streaming in Ultra-Long High-Altitude Tunnel with MiNEMedia R20

On November 3, the 2026 comprehensive emergency drill was held in the Tianshan Shengli Tunnel of G0711 Urumqi-Yuli Expressway. As the world’s longest highway tunnel, this drill was highly practical with multi-department joint operations. The MiNEMedia R20 multi-network bonding switcher delivered stable live video transmission throughout the whole drill, providing reliable video support for command and dispatch.

The drill simulated multiple hazardous scenarios including earthquake, power outage and vehicle fire. It covered 8 phases and 16 subjects to test cross-regional coordination and rescue capabilities. Constrained by deep tunnel signal conditions and scattered on-site locations, traditional broadcasting equipment faced heavy deployment challenges, raising strict requirements for transmission stability and scheduling efficiency.

For live production of this drill, the MiNEMedia R20 switcher was deployed inside the broadcasting vehicle as the core of the whole live streaming system. It unified scheduling of multiple on-site video signals and handled on-site production.


Faced with complex environments such as tunnels and mountainous areas, MiNEMedia keeps developing professional live streaming equipment. With solid product performance, it delivers dependable support for various emergency drills and live event production.

Emergency guarantee for major infrastructure projects cannot be separated from reliable audio & video transmission technology. MiNEMedia will continue to develop multi-network bonding transmission technology. Oriented to tunnel rescue, mountain emergency response, high-altitude live production and more scenarios, it keeps providing lightweight, high-reliability integrated solutions. With stable video transmission capability, MiNEMedia safeguards the safe operation of major engineering projects and escorts practical emergency rescue drills.